Thursday, 12 September 2013

At last - a useable Darkroom!

The end of another long evening! Now got running water, (and tonight it is mainly in the pipes and not on the floor) all sinks plumbed in, water heater fitted and working and the flooring finished. Just need splash backs and shelving to finish the wet darkroom.

I have timber and plasterboard stored in the van so the aim for next week is to get the studio ready for painting.  My friend Mina has booked a stall for us in a craft fair in two weeks so need to get some images produced.  Stops me getting bored!



No comments:

Post a Comment