Well I made it to Friday and the energy, ad
the money, have just about run out. T
was Andy’s second day on the wiring and by the end every thing worked perfectly
– 5 double sockets down each side of the
studio/gallery. Sockets on each side for overhead spots, 4 double
sockets in each darkroom and lighting in all rooms – perfect.
Meanwhile, I carried on with the plaster
boarding, until it ran out. I moved the
big sink from my home darkroom and built a frame for it –then the worst job of
the week, bagging up the rubble. Been a
long week, but got so much done. Think
I’ve deserved a rest in Wales.



No comments:
Post a Comment